All North Bury East Bury Radcliffe Prestwich/Whitefield

Location:

Fire Remedial Works to Communal Properties at Various Schemes (Phase 2)

Works to be carried out:

Fire Remedial Works to communal properties at various schemes. Includes where necessary:

- Replacement of fire rated doors and communal cupboard doors
- Changing door locks and closers
- Loft hatches upgraded to fire-rated
- Some emergency lighting

Number of properties:

See addition information for address list

Proposed start:

TBC

Read more

Location:

Various as needed

Works to be carried out:

Installation of composite doors and frames.

Number of properties:

65

Proposed start:

July 2021

Read more

Location:

Warden Control System - Top of the Fields, Waverley Place, Moorfield and Wellington House

Works to be carried out:

Warden call system

Number of properties:

4 Sheltered Housing Blocks

Proposed start:

July 2021

Read more

Location:

Kestrel Drive

Works to be carried out:

Communal upgrade works to include door entry, emergency lighting and flooring.

Number of properties:

6 blocks

Proposed start:

August 2021

Read more