Location:

Fire Remedial Works to Communal Properties at Various Schemes (Phase 2)

Works to be carried out:

Fire Remedial Works to communal properties at various schemes. Includes where necessary:

- Replacement of fire rated doors and communal cupboard doors
- Changing door locks and closers
- Loft hatches upgraded to fire-rated
- Some emergency lighting

Number of properties:

See addition information for address list

Proposed start:

TBC

Read more

Location:

Hazel Hall Lane

Works to be carried out:

Installation of external wall insulation.

Number of properties:

6 - start and finish date to follow

Proposed start:

April 2021

Read more

Location:

Harrogate Square

Works to be carried out:

Installation of door entry systems, flooring, stair ballustrades, post Boxes, decoration and communal doors.

Number of properties:

5 Blocks

Proposed start:

May 2021

Read more

Location:

Various as needed

Works to be carried out:

Installation of composite doors and frames.

Number of properties:

65

Proposed start:

July 2021

Read more

Location:

Harwood Crescent

Works to be carried out:

Communal Upgrades works to include door entry, emergency lighting and flooring.

Number of properties:

5 Blocks

Proposed start:

July 2021

Read more

Location:

Warden Control System - Top of the Fields, Waverley Place, Moorfield and Wellington House

Works to be carried out:

Warden call system

Number of properties:

4 Sheltered Housing Blocks

Proposed start:

July 2021

Read more

Location:

Tagwood/Dundee/Peel Brow Internal Works

Works to be carried out:

Installing new kitchens, bathrooms and central heating (some properties may have already had heating installed).

Number of properties:

71

Proposed start:

August 2021

Read more

Location:

Wesley Court

Works to be carried out:

Installation of door entry systems, new flooring, stair balustrades, post boxes, decoration and communal doors.

Number of properties:

4 Blocks

Proposed start:

September 2021

Read more

Location:

Stephen Close - 5 blocks

Works to be carried out:

Installation of door entry systems on 5 blocks, new flooring, stair balustrades, post boxes, decoration and communal doors.

Number of properties:

5 Blocks

Proposed start:

October 2021

Read more

Location:

Woolfold Internals

Works to be carried out:

Internal upgrades to include kitchens, bathroom and boilers - please note work will vary in each property.

Number of properties:

50

Proposed start:

January 2022

Read more